MENU

Middle Dural Residence

Situated on a sprawling 5-acre estate in Middle Dural, western Sydney, this majestic project showcases three elegantly designed pavilions, totaling an impressive 800 square meters of building footprint. The meticulous construction process, spanning three years, demonstrated exceptional craftsmanship and attention to detail, successfully achieving BAL-40 certification and incorporating over 500 square meters of cutting-edge, high-performance double glazing. This remarkable achievement deserves recognition for its innovative design, technical excellence, and masterful execution.

Upon approaching the driveway, one is immediately captivated by the imposing structure's sheer scale, stretching longer than a football field. The visual feast is mesmerising, with the eye drawn to multiple focal points. This masterpiece of design and architecture is a true work of art, showcasing innovative excellence and pushing boundaries. Its grandness and beauty leave a lasting impression, making it what we believe to be a standout contender for this award.

This exceptional project successfully met the client's brief, showcasing our level of dedication to precision and excellence. Our long-term master builder, Steve Mallinger, brought a clear vision of sleek lines and seamless transitions to life through meticulous planning and execution.

We carefully selected premium AWS window and door suites, renowned for their sleek design and performance (designed and manufactured in Australia), and paired them with high-performance Low-E double glazing, exceeding BAL-40 specifications. A harmonious blend of aluminium and bespoke timber products enabled us to meet all design requirements.

Despite the challenges posed by COVID-19 restrictions and supplier constraints, our team persevered, leveraging effective communication and project management to overcome obstacles and deliver the project to the client's utmost satisfaction. This outstanding achievement spanned three years, a testament to our unwavering commitment to excellence.
This project presented several major technical highlights and complexities, showcasing innovative solutions and meticulous attention to detail.

Flush threshold transitions were used at sliding door units, requiring precise alignment with internal floor finishes for a seamless blend between internal and external surfaces. Huge, raked end gable window frames featuring double-glazed glass posed a significant installation challenge, requiring precise placement with the aid of crawler cranes. The BAL-40 specification added an extra layer of complexity, particularly regarding the extensive glazing areas.

However, through strategic adjustments to the layout and configuration, we successfully achieved certification while maintaining the original design vision.

We overcame the complexities by employing new methods and solutions, including sourcing certified timber products for joinery, which enabled our skilled craftsmen to create stunning pivot doors and garage door units that blend seamlessly into the wall facades. By utilising performance solutions to meet Australian Standards, rather than relying solely on Deemed-to-Satisfy (DTS) approaches, we ensured a more tailored and effective approach to compliance.

Compliance with Australian Standards was addressed through DTS and performance solutions. By adopting a performance-based approach, we met the required specifications while achieving the desired design intent. We achieved BAL-40 certification through meticulous design and material selection, ensuring the necessary level of bushfire resistance. Our glazing and window frame specifications also met the required performance standards for wind loading, water penetration, and thermal performance.

Safety was a top priority throughout the project, and we ensured a secure working environment through stringent site management and supervision, regular safety audits and inspections, and the implementation of fall protection systems and scaffolding to guarantee safe access and working at heights.

Through careful planning, attention to detail, and innovative solutions, we successfully addressed this project's technical complexities and safety requirements, delivering a stunning and compliant outcome.

Any project that combines BAL-40 with WERS thermal requirements poses a complex challenge to any Fabricator involved. The Evolution team had to think creatively to provide a consistent solution for every opening, ensuring a seamless aesthetic appeal.

When you are engaged to a project of this stature and value, the quality of the products and workmanship must have no compromise, not only in your factory, but must flow through to safe delivery, accurate installation and then site protection. The team at Evolution delivered on all fronts with a spectacular outcome.

This outstanding project yielded a stunning home, showcasing impeccable finishes and thoughtful design, which substantially enhanced its overall aesthetic and charm.

This project was uniquely driven by the owner's dual role as builder, injecting an unwavering passion and dedication to excellence. With a clear and ambitious vision, our team worked tirelessly to bring this concept to life.

The result is a breathtaking residence that has exceeded the family's expectations, boasting expansive glass features that seamlessly connect the indoors to the outdoors, providing a stunning view from every angle. The family's unbridled enthusiasm and joy in their new home is a testament to the project's success.

For more information on how Evolution Window Systems can help you:

Call us on (02) 9833 0855